Proper and specific site planning and inspection are conducted according to authorised issued specifications, procedures and drawings.
|
|
|
|
|
The tree systems are developed to achieve minimal assembly and erection time during the tree system implementation on site and in most situations within the minimum cranage time. Our site personnel are well trained to handle cranage up to 350 ton within very difficult terrain conditions.
|
|
Although our systems are modular in design which require a minimum of rigging
tools we do utilise state of the art equipment to assist our personnel viz- Wireless radio systems to improve ground to tower communication between personnel. Site staff are issued with safety equipment that comply with local safety standard. Site crew are equipped with a first aid box to attend to any minor injuries. |